Search Results

Your search results for "the" are below. Click tabs to filter by type.

The Filbornaverket waste-to-energy plant in Helsingborg produces steam, district heating and electricity. The main fuel is combustible fractions of waste from households, industry and businesses. The plant uses the region’s large quantities of combustible waste to produce electricity and district heating for the local grid.

View Web Page

Located some 40 kilometres north of Dublin, Ireland’s first waste-to-energy plant began delivering electricity to the city’s grid in November 2011. Babcock & Wilcox Renewable (B&W) provided the boiler, combustion grate, combustion control, and selective non-catalytic reduction (SNCR) system.

View Web Page

The plant processes local residual household, commercial and industrial waste. It generates 7.25 MW of green energy, contributing to Peterborough Council’s Blue Sky project to provide sustainable energy in a smart city environment.

View Web Page

Ranking as the cleanest, most efficient plant of its kind in the world, this engineered, designed, procured and constructed WtE facility reduces landfill volume by 90%.

View Web Page

The Sundsvall waste-fired power plant is the first plant with B&W’s new cast water-cooled grate bars. The boiler is designed with three-vertical passes and horizontal convection part.

View Web Page

A V-Temp temperature control system has been successfully installed on utility steam boilers operating at lower loads.

View Web Page

Titanium® intelligent sootblowing improves performance at 700 MW plant.

View Web Page

Valent BioSciences LLC (VBC), a wholly owned subsidiary of Sumitomo Chemical Company, operates a biorational product manufacturing facility in Osage, Iowa. The first purpose-built biorational manufacturing plant in the world, the facility supplies products derived from fermentation using locally grown agricultural raw materials.

View Web Page

After initial commissioning in 2011, this 700 MW advanced supercritical boiler, originally supplied by Foster Wheeler, was later modified to improve operation of its distributed control system (DCS), air quality control system to accommodate high-sulfur coal, and turbine.

View Web Page

When plant operators observed that the unit could not light off, they called upon B&W to help assess the condition of the ignition equipment and develop a plan to refurbish it to safe, reliable operation. Read how we worked with plant personnel to pull all 96 of the unit’s ignitors and refurbish them to OEM standards.

View Web Page