Assessing Structural Integrity and Remaining Life of Boiler Tubing
Power plant operators looking to get the most out of their existing steam generating systems are constantly faced with the decision to “run, repair or replace” their equipment and prevent unplanned outages that impact operations. As boiler tube failure is the leading cause of unscheduled availability loss, an important preventive measure is testing boiler tubes to analyze their condition and gauge their remaining useful life.
View Web PageBoiler Fitness Survey for Condition Assessment of Industrial Boilers
B&W provides an overview and benefits of establishing a formal boiler fitness survey program, focusing on units in industrial applications.
View Web PageReducing Potential Superheater Casing Failures in Sulfuric Acid Plant Applications
In the superheater inlet transition ducts, environmental exposure can lead to cracks and/or warping of the casing and stiffeners. What modifications can help reduce failures?
View Web PageBenefits of Cylindrical Superheater Casings for Waste Heat Recovery Systems in Sulfuric Acid Plant Applications
B&W Chanute developed its Optimus cylindrical superheater casing for waste heat recovery superheaters and economizers for hot, high-temperature applications.
View Web Page10 Ways to Minimize Grate Wear in a Waste-to-Energy Boiler
Thermal and mechanical grate wear increases maintenance costs. If the grate is not operated correctly, or if combustion is not properly managed, wear accelerates and there is risk of substantial damage. As a fuel, waste tends to be unpredictable and varies over time. It presents challenges for the plant, and can cause mechanical, thermal and chemical wear.
View Web PageReagent Preparation and Dewatering in a Wet FGD System
If limestone consumption must be increased to improve SO2 removal, the reagent preparation and dewatering systems may be undersized. In most cases, higher SO2 removal requires a finer grind than what older systems were originally designed to achieve.
View Web PageBid Evaluation Example
The example below provides a comparison between two industrial boiler bids where one bidder has a higher price but with a unit that has higher efficiency. Bid 1 guarantees 86.5% efficiency with a price of $10,400,000. Bid 2 guarantees 87.5% efficiency with a price of $11,200,000.
View Web PageLimestone Forced Oxidation System Upgrades
A wet FGD can be converted to forced oxidation using the existing reaction tank, or in some cases, an external oxidation tank can be used. This conversion will minimize scaling from utilization of stable system chemistry and creating a saleable byproduct which will decrease disposal costs.
View Web PageMist Eliminators and Mist Eliminator Wash System
Older generation ME wash system designs tended to not effectively wash all surfaces of the MEs when compared to current designs. Fixed grid ME wash headers can be retrofitted in place of retractable lance-style wash systems or fixed grids that were ineffective in washing the ME surfaces.
View Web PageFactors that Affect ESP Collection Efficiency and Ways to Improve Performance
This article will review several design and operational problems that will negatively affect the collection performance of an ESP. It will also outline potential modifications to help improve performance and efficiency.
View Web Page