An Energy-from-Waste (EfW) facility, located in the province of Maha Sarakham in central
northeastern Thailand, will feature state-of-the-art steam generation, combustion and environmental technologies from Babcock & Wilcox Renewable (B&W). Anticipated to go into service in 2025, the plant is designed to generate electricity as well as steam for industrial use.

View Web Page

Vølund® Waste-to-Energy Technology

Kelvin is a waste-to-energy (WTE) facility now under construction in Sandwell West Midlands, just outside Birmingham, U.K. When operational, it will divert 395,000 tonnes of non-recyclable household and business waste from landfill or export overseas. The residual waste will be used to generate 44 MW (gross) of baseload energy, equivalent to the needs of more than 95,000 homes.

View Web Page

Edmonton, Alberta, Canada Success Story

An oil refinery in Edmonton, Alberta, Canada was experiencing boiler failures that were having a frequent and negative impact on its operations. This project showcases how the linkage of creative engineering, material supply and advanced construction planning come together to meet ambitious goals and minimize impacts to customer operations during and well after project completion.

View Web Page

Refinery, Western Europe

To assist with a plant upgrade, one of the largest refineries in Europe selected and presented B&W Environmental (B&W) with a bold challenge: the comprehensive disassembly and reassembly of a SPIG® fiber reinforced polymer (FRP) Cooling Tower (CT) comprising two cells within a tight 21-day timeframe to synchronize with a planned shutdown. B&W’s team engineered the execution plan that required both speed and precision.

View Web Page

Wet/Dry EPSs | Wet Gas Scrubbers | Pulse Jet Fabric Filters

Our experience with innovative emissions control technologies includes our established OEM experience base as well as technologies added through strategic acquisition, such as Hamon Research-Cottrell, Joy Environmental and Western Precipitation. These projects highlight a range of emissions control success stories for various applications in several industries.

View Web Page

IVM Eeklo

Babcock & Wilcox Renewable Service (B&W) won the order for replacement of superheaters 1, 2 and 3 and on-site Inconel® cladding in the first boiler pass of IVM’s waste-to-energy line 2 in Eeklo, Belgium.

View Web Page

SUEZ Recycling and Recovery UK Ltd

In 2021, Babcock & Wilcox Renewable Service (B&W) won the order from SUEZ Recycling and Recovery UK for engineering, manufacturing, delivery and installation of new Inconel®-cladded furnace walls for the Greater Manchester Combined Authority (GMCA)-owned Thermal Recovery Facility at Raikes Lane, Bolton, England.

View Web Page

Sundsvall Energi AB - Sweden

B&W Renewable Service won this project for onsite Inconel® cladding and combustion air upgrade at Korstaverket in Sundsvall, Sweden. The client also requested the possibility to increase the capacity of the boiler. We also performed a computational fluid dynamics (CFD) model and recalculated all boiler parameters.

View Web Page

SNCR Case Study

B&W Renewable helped WtE CHP plant in Sweden improve plant operations and reduce NOx and CO2 emissions.

View Web Page

Energnist Case Study

Energnist on 18-month intervals: We save three weeks every three years
Every three years, Energnist gains three weeks of operation and saves the costs of preparing for the maintenance shutdown. One and a half years between maintenance shutdowns can provide benefits if thoroughly prepared.